88.43 kWp Solar at Skyline Luge Sentosa

Aerial view of an 88.43 kWp solar panel installation across the metal roofs of the Skyline Luge buildings at Siloso Beach, Sentosa, Singapore, overlooking the beachfront and anchored ships offshore, installed by Rezeca Renewables in 2025

Type
Commercial
Location
Singapore
Area
Sentosa, Sentosa, Singapore
Property
Retail
Capacity
88.43kWp
Roof material
Metal Roof
Yearly savings
$31,200
Year of completion
2025
88.43 kWp commercial solar PV system at Skyline Luge, Siloso Beach Walk, Sentosa, Singapore. Coastal metal roofs. Commissioned 2025.

Rezeca Renewables installed an 88.43 kWp solar PV system at Skyline Luge Sentosa, Siloso Beach Walk, on Sentosa island, Singapore. The system was commissioned in 2025.

About this installation

As the photograph shows, the panels span the metal roofs of the attraction's buildings on the Siloso beachfront, with the sea and anchored ships beyond. In this coastal, salt-exposed setting the system uses corrosion-resistant mounting, and the work was carried out at night only so the Luge could keep operating for visitors throughout the project.

The result

At 88.43 kWp, the system generates an estimated 97,300 kWh of clean electricity a year, offsetting a substantial share of the attraction's daytime load. Surplus generation is exported under Singapore's Simplified Credit Treatment (SCT) scheme.

Result: about 97,300 kWh of solar electricity a year and estimated savings of about S$31,200 a year, running since 2025.

More solar in Harbourfront, Telok Blangah & Sentosa

See every Rezeca installation in Harbourfront, Telok Blangah & Sentosa (D04), or browse solar by district.

Explore more of Rezeca's commercial work, including our Ngee Ann Polytechnic and Harding Road projects.

The installation was completed by Rezeca's in-house team of solar engineers and WSH-certified installers, with all electrical work endorsed by a Licensed Electrical Worker (LEW) and registered with SP Group. Rezeca has installed solar across Singapore since 2009, with more than 1,500 installations and 45+ MWp to date.